
PHUOC SON TECHNICAL TRADING & SERVICES CO., LTD
Sales Consultation: +84 905 210 146 - +84 935 632 123
Q3 LED Display Project (63m²) at the 5th Military Region Staff Headquarters: High Demands – Superior Execution
Phuoc Son Technical Trading & Service Co., Ltd. is honored to have been trusted and selected as the contractor to deploy the Indoor Q3 LED Display System with a total area of 63m² at the central auditorium of the Staff Headquarters of the 5th Military Region. The successful completion of a project requiring such rigorous standards regarding technique, schedule, and safety has once again affirmed Phuoc Son's leading position and capability.
MISSION REQUIREMENTS & PROJECT OBJECTIVES
The project was set with strict requirements to serve critical military operations:
Primary Goal: To comprehensively modernize the auditorium's projection system, serving conferences, briefings, training sessions, and significant ceremonies of the Military Region.
Technical Requirements: Required a large-format seamless screen with high resolution, precise color reproduction, and absolute reliability to ensure stable operation during every working session.
Schedule Requirements: Construction and completion within an extremely tight timeframe to avoid disrupting the unit's operational schedule.
SELECTED TECHNOLOGICAL SOLUTION: Q3 LED CABINET SYSTEM
To meet these stringent requirements, Phuoc Son consulted and deployed the Indoor Q3 LED Display System.
Product Insight: The "Q3" series is a high-performance LED display with a pixel pitch of ~3mm, constructed from standard 576x576mm cabinets. Unlike loose modules, this cabinet system ensures:
Absolute Precision: The cabinets are die-cast from high-precision aluminum. When assembled, they create a perfectly flat surface with no gaps.
Rapid Installation: Smart locking systems between cabinets significantly shorten construction time.
Easy Maintenance: Individual cabinets can be easily replaced for maintenance without affecting the entire system.
PLANNING & EXECUTION: COMPLETING 63M² IN JUST 4 DAYS
The highlight of this project was the speed of execution. With a massive workload involving 180 LED cabinets and a complex structural system, Phuoc Son’s team executed a detailed and scientific plan:
Day 1-2: Material staging and construction of the precision-engineered steel support structure.
Day 3: Installation of all 180 cabinets onto the frame, connecting the signal and power systems.
Day 4: System calibration, testing, handover, and operational training.
Completing the entire 63m² project in just 4 days is a record achievement, demonstrating the superior project management and technical proficiency of the Phuoc Son team.
PROJECT SUMMARY
|
Category |
Details |
|
Project |
Central Auditorium LED Screen Installation |
|
Investor |
Staff Headquarters of the 5th Military Region |
|
Product |
Indoor Q3 LED Display |
|
Structure |
180 LED Cabinets (576x576mm) |
|
Total Size |
63 m² |
|
Execution Time |
4 Days |
|
Contractor |
Phuoc Son Technical Trading & Service Co., Ltd. |
COMMITMENT TO SAFETY, SECURITY, AND QUALITY
Working in a military environment requires strict adherence to safety and security regulations. Phuoc Son commits that our construction team is always professional, disciplined, and ensures absolute safety throughout the deployment process. The product is supplied with full quality certifications and a genuine 24-month warranty.
The project at the 5th Military Region Staff Headquarters is a source of pride and the clearest proof of Phuoc Son's ability to conquer the most demanding projects.
Contact Phuoc Son to receive consultation on world-class projection solutions for your critical projects!